Blizzard Pond claim block is near Marathon Gold’s Valentine Gold Project, with some 4 M oz and under development. This area was staked on the basis of anomalous gold in historic till and lake sediment sampling. The requisite structural control is a regional fault corridor along the south west margin of the claim block. First pass soil sampling will be completed here in 2021. Road access is from the town of Badger.